Make the First Parts and Approve Them
For prototypes, we machine or print parts fast so you can validate the design. For production, we build the mold or die, with DFM and flow review already done, and run T1 samples for your approval. This step proves the design and the process before volume. Here is how it works.
Prototypes
Machined or printed prototypes in real materials, from 3 days on simple parts, so you can validate fit, function and looks. Fast prototypes let you iterate quickly and find problems cheaply, before tooling.
Tooling
For molding and casting, we build the tool and run T1 samples for your approval. We measure the samples against the drawing and adjust until they meet spec. You approve before we run volume, so production starts from a proven tool.
Approve Before Moving On
You approve prototypes or T1 samples before we move to production. This prevents a batch of wrong parts, which is the whole point of this gate. If something needs changing, we iterate until the parts meet spec.
Iterate
If something needs changing, we iterate until the parts meet spec. For prototypes, this is fast; for tooling, we adjust the tool and re-run samples. We do not move to production until you are satisfied.
Documented
Approved samples and specs are kept on file for the production run, so production matches what you approved. This documentation is the reference for the whole job, and it ensures consistency.