Prove the First Part Before the Batch
First article inspection verifies the first part fully against the drawing before a production run. It proves the process can make the part correctly, so you do not discover a problem after a whole batch is made. FAI is one of the most important quality gates, because it catches setup and process errors before they multiply. Here is how we do it.
Full Verification
We measure every dimension and GD&T callout on the first part and record the results. This is not a spot check; it is a complete verification against the drawing. Every requirement is checked, so nothing is missed before production starts.
Report
You get a first article report showing each feature, its spec and the measured result. The report is the evidence that the part meets the drawing, and it gives you a reference for the production run. We can provide it in your required format.
Before Production
Production only starts after the first article is approved. This prevents a whole batch of wrong parts, which is the whole point of FAI. If the first article fails, we fix the process and re-run until it passes, so production starts from a proven setup.
When Required
FAI is standard for new parts and after process changes, and it is available on request for any production order. Many customers require it as part of their quality system, and we support it fully. Even when not required, it is good practice for any new or changed part.
Agree the Method
We agree the measuring method and datum setup with you before production, so the report is not disputed. For tight tolerances and GD&T, the measurement setup matters, so agreeing it up front prevents arguments. We document the method along with the results.







